VIDEO: SM CDO Downtown Tower – Premier Office Spaces in the Heart of the City

SM CDO Downtown Tower is a premier office building with state of the art facility located at the heart of the city. This project is the latest development of SM Prime Holdings Inc. aimed towards providing economical, flexible and conveniently located office spaces.

  • The only BPO Building in the region with a helipad.
  • 24/7 Security and Engineering support and an uninterrupted electric and water supply.
  • The 5th Floor Sky Garden connects directly to the SM CDO Downtown Premier mall.

SM CDO Downtown Premier is a world-class shopping center with international fashion brands and concepts. The 5-storey mall with a grand geometric glass facade and water feature at the entrance also have banks and other service outlets to choose from. Mall features include the Sky Garden, a four-level parking building and Director’s Club.

Cagayan de Oro, being the Gateway to Mindanao, highly accessible by land, sea, and air is a highly urbanized city with 675,950 consumers residing in 143,514 households. The Cagayan de Oro City Downtown, housing prime universities; major commercial and business establishments; city civic centers and government institutions, is sure to address the needs of a wide array of companies.

  • 58 minutes from Laguindingan Airport
  • Numerous shuttles that have pick-up/drop-off from Laguindingan Airport to CM Recto.
  • Cagayan de Oro Port is 5 minutes away from the mall. Regular routes to and from Manila, Cebu, and Iloilo.

To know more about SM CDO Downtown Tower, log on to www.smprime.com or call 09175578197. You may also email [email protected] for any further details.

General information:

  • Developer: SM Prime Holdings Inc.
  • Completion Date: 3Q 2018
  • Gross Leasable Area 17,549.68 sqm
  • Typical Floor Plate: 2,300 sqm (can be cut to accommodate smaller spaces. minimum space requirement: 50 sqm.
  • Ceiling Height: 5th to 6th Floor: 4.8m | 7th to 12th floor: 4.2m
  • Fit Out Ceiling Height: 3m
  • Handover Condition: Bare shell, smooth finish flooring ready to receive carpet tiles
  • Passenger Elevators: 6 High-Speed Units
  • Air Conditioning: Fan Coil Unit (FCU) System
  • Backup Power: 100% Backup
  • Telco Provider: Globe, Smart, Philcom (Fiber Optic)

WHAT'S NEW