P9.61-Million Seaside Boardwalk in Opol as of September 2021
Have you been to the Opol Boardwalk lately? Here’s the latest update of the P9.61-million seaside project as of September 2021.
Project Cost
The Opol Boardwalk project cost is P9.61 Million.
Location
Opol Boardwalk is located in Brgy. Poblacion, Opol, Misamis Oriental.
Sunset
Here’s a spectacular sunset view of the Opol Boardwalk.
Photos
Check out the photos of the Opol Boardwalk below.
![](https://i0.wp.com/www.projectlupad.com/wp-content/uploads/2021/09/P9.61-Million-Seaside-Boardwalk-in-Opol-as-of-September-2021-Copyright-to-Project-LUPAD-1.jpg?resize=1024%2C640&ssl=1)
![](https://i0.wp.com/www.projectlupad.com/wp-content/uploads/2021/09/P9.61-Million-Seaside-Boardwalk-in-Opol-as-of-September-2021-Copyright-to-Project-LUPAD-2.jpg?resize=1024%2C640&ssl=1)
![](https://i0.wp.com/www.projectlupad.com/wp-content/uploads/2021/09/P9.61-Million-Seaside-Boardwalk-in-Opol-as-of-September-2021-Copyright-to-Project-LUPAD-3.jpg?resize=1024%2C640&ssl=1)
![](https://i0.wp.com/www.projectlupad.com/wp-content/uploads/2021/09/P9.61-Million-Seaside-Boardwalk-in-Opol-as-of-September-2021-Copyright-to-Project-LUPAD-4.jpg?resize=1024%2C640&ssl=1)
![](https://i0.wp.com/www.projectlupad.com/wp-content/uploads/2021/09/P9.61-Million-Seaside-Boardwalk-in-Opol-as-of-September-2021-Copyright-to-Project-LUPAD-5.jpg?resize=1024%2C640&ssl=1)
![](https://i0.wp.com/www.projectlupad.com/wp-content/uploads/2021/09/P9.61-Million-Seaside-Boardwalk-in-Opol-as-of-September-2021-Copyright-to-Project-LUPAD-6.jpg?resize=1024%2C640&ssl=1)
![](https://i0.wp.com/www.projectlupad.com/wp-content/uploads/2021/09/P9.61-Million-Seaside-Boardwalk-in-Opol-as-of-September-2021-Copyright-to-Project-LUPAD-7.jpg?resize=1024%2C640&ssl=1)
![](https://i0.wp.com/www.projectlupad.com/wp-content/uploads/2021/09/P9.61-Million-Seaside-Boardwalk-in-Opol-as-of-September-2021-Copyright-to-Project-LUPAD-8.jpg?resize=1024%2C640&ssl=1)
![](https://i0.wp.com/www.projectlupad.com/wp-content/uploads/2021/09/P9.61-Million-Seaside-Boardwalk-in-Opol-as-of-September-2021-Copyright-to-Project-LUPAD-9.jpg?resize=1024%2C640&ssl=1)
![](https://i0.wp.com/www.projectlupad.com/wp-content/uploads/2021/09/P9.61-Million-Seaside-Boardwalk-in-Opol-as-of-September-2021-Copyright-to-Project-LUPAD-10.jpg?resize=1024%2C640&ssl=1)
![](https://i0.wp.com/www.projectlupad.com/wp-content/uploads/2021/09/P9.61-Million-Seaside-Boardwalk-in-Opol-as-of-September-2021-Copyright-to-Project-LUPAD-11.jpg?resize=1024%2C640&ssl=1)
![](https://i0.wp.com/www.projectlupad.com/wp-content/uploads/2021/09/P9.61-Million-Seaside-Boardwalk-in-Opol-as-of-September-2021-Copyright-to-Project-LUPAD-12.jpg?resize=1024%2C640&ssl=1)
![](https://i0.wp.com/www.projectlupad.com/wp-content/uploads/2021/09/P9.61-Million-Seaside-Boardwalk-in-Opol-as-of-September-2021-Copyright-to-Project-LUPAD-13.jpg?resize=1024%2C640&ssl=1)
![](https://i0.wp.com/www.projectlupad.com/wp-content/uploads/2021/09/P9.61-Million-Seaside-Boardwalk-in-Opol-as-of-September-2021-Copyright-to-Project-LUPAD-14.jpg?resize=1024%2C640&ssl=1)
![](https://i0.wp.com/www.projectlupad.com/wp-content/uploads/2021/09/P9.61-Million-Seaside-Boardwalk-in-Opol-as-of-September-2021-Copyright-to-Project-LUPAD-15.jpg?resize=1024%2C640&ssl=1)
![](https://i0.wp.com/www.projectlupad.com/wp-content/uploads/2021/09/P9.61-Million-Seaside-Boardwalk-in-Opol-as-of-September-2021-Copyright-to-Project-LUPAD-16.jpg?resize=1024%2C640&ssl=1)